Thursday, July 16, 2020

"Special Toys" Workshop held today (July 16, 2020)

Today's To Do List





Workshop went well.  Yes, we finished puppies, dachshunds, caravans, helicopters (2 kinds), and firetrucks, all special toys!  (Jerry actually assembled firetruck #3 with ladders and top lights at home prior to the gathering.)  Grant brought finished tugboat cabins;  Lon brought 3 boxes ready to seal.  Grant revitalized one of the router tables with a nice new Plexiglas top.  Patsy brought 21 bags ready for critters.

 We now have 13 boxes ready to be sprayed.  Lon took 3 boxes home to work and Ken took a box.  Jerry took two boxes home to work.  Just have 2 boxes of critters here left to sand and router.  




Note to Rick:  Ken will be dropping off six boxes of toys in your driveway soon, all ready for inventory.  Thanks!


Rick:  All the toys were delivered, social distancing was maintained. No toys were damaged in transition.  All is well.


For more information about the Woodworkers, click here:   RCWA





Saturday, June 27, 2020

Last Alarm Fire Bell Delivered to Rapid City Fire Department (Station 01) 6-24-2020

For pictures and a story about the delivery of the Rebuilt Last Alarm Fire Bell Cabinet, click on this Facebook link:  Last Alarm Story on Facebook












For more information about the Woodworkers, click here:   RCWA



Wednesday, June 3, 2020

Toy Program Update: 6-3-2020

Toy Program Update: 6-3-2020 -- No Monthly General Meeting in June

Here's an update and activity log of toy-making since last month's update:  We continue with our virtual Toy Workshops, that is, everybody working remotely in their own shops.

Boxes are still moving in and out of members shops and into sanding homes, sealing booths, finishing booths, and wheel assembly areas.  Some places in town are opening up and there are a few places you can eat and be served if you desire.  Here's a recap of the last few weeks and the movement of boxes.

May 9, 2020:  (Day before Mother's Day)

I worked on a cutout for Mother's Day.  Kathie is somewhat allergic to real flowers in the house, so there you go!

  


Hair keeps getting in my eyes - so I ordered head bands from Amazon!


May 11, 2020
Harley P brought some critters, some cut and some still to cut.  He's hoping to do some gardening soon.

May 12, 2020
I checked in with Harley S and he's doing fine, plowing snow just to get out of the house.
Eye doctors are open now, ready for business.  😊

May 13, 2020
Dentist is open too, so went for cleanings.  Ralph lives next door to the Dentist, so we dropped off 3 boxes of toys (amoebas, ATVs, and bears) to Ralph for installing wheels.  Afterwards, we shopped Menard's - got some hardware, set of 4 wheels, some taco shells, soup, and plate hangers.  (All because of the quarantine effect.)

May 14, 2020 (raining most of the day)

Eye surgeons open too, so set up more appointments.  Developed Quarantine Effect (QE) Basement Shelving plans.  Work on recycled four drawer cabinet.  Install air reel on ceiling in shop.

Got pictures from Danny today showing progress on the Fire Bell:

  



May 16, 2020
Jerry and Patsy dropped off  boxes of double heart boxes and ladders for firetrucks.
Revised QE Basement Shelving plans for basement due to major error in estimate for Bill of Materials.  Also added a third shelving unit to the project, for critters in new shop.

May 17, 2020
Kathie sealed a large group of toys (212) which included trucks, sharks, tow trucks, delivery trucks, love bugs, hear boxes, and ladders.  Order paint brushes from Amazon.

  

  

May 18, 2020
Kathie went to dentist for a new crown.  I went shopping for materials for the QE Basement /Critters Shelving project.  Bought tie downs so 2x4s wouldn't fly out on the highway.  Got gas for truck:  $1.43 per gallon... worth recording here!

Toy Program:  Ken dropped off two boxes of toys ready to be sealed.  He also picked up two boxes of oak basketball game parts to mill.  Al picked up four boxes of toys to edge router.  Rick texted that Ralph had dropped off toys ready for inventory:  24 bears, 29 ATVs, and 19 amoeba cars.  As of 5-18:  410 toys from 2019 + 347 =  757  toys


Meanwhile. we moved tubs from mechanical room to den.  Larry helped me download materials thru basement window to a holding area.  Cleared the mechanical room of leftover supplies from the Basement Finishing project of 2011.   Staged some material in shop to cut to size on table saw.  In garage on sawhorses, I cut OSB to size for shelves and then downloaded it thru the basement window as well.  Moved miter saw and air compressor to the basement, as well as the pin nailer to nail down molding on the stairs.

May 19, 2020
Toy Program:  Spray finish toys:  turtle banks, PT cruisers, Jeeps, small bugs, paddles, puppy ears, puppy dogs, hippos.

  

Received notices from Mary Jo and Bel that they had hand-sanded toys ready for pickup.

To-Do List of tasks for special toys:
  1. Paddle games - need ball/strings
  2. Ring toss - need ball/strings
  3. Helos - need rotors
  4. Puppy dogs - need ears 
  5. Firetrucks - need ladders
  6. Tow Trucks - need hooks
  7. Heart Boxes - need felt
  8. Turtle Banks - need plexiglass
May 20, 2020

Haircuts (3.5 months) - YAAAY!  Paul Douglas dropped off 3 boxes of toys hand-sanded and ready to finish.  I built shelf frames for QE Shelving project.

May 22, 2020

Toy Distribution Run today - dropped off and picked up 8 boxes of toys from Mary Jo and from Bel, took 53 Turtle Banks to Rick, and four boxes of toys to Ralph for installing wheels.

Assembled two QE shelving units in basement:  2' deep x 7.5' long x 7" high.  Installed shelves on shelving frames.

  


May 23, 2020 (rain/hail/mild temps)
Watched son's online High School Graduation from LaPorte, IN.

May 24, 2020
Update toy inventory list:  As of 5-18:  410 toys from 2019 + 347 =  757  toys

May 25, 2020 Memorial Day
Ed brought 3 boxes of hand sanded toys ready to finish.  Ed returned 3 boxes of toys yet to be cut.

May 26, 2020
Kathie went to dentist for a second new crown.  So, I dropped off four boxes of toys to Ralph's for installing wheels.   Mow grass.




May 27, 2020
Received word that Bel has four boxes of toys hand sanded and ready for finish.

May 28, 2020
Al Oines dropped off four boxes of toys ready to seal.  Ralph has finished installing wheels on the four boxes delivered on Tuesday.

Julian is keeping busy during lockdown - working in the Shop - I received photos from Julian's shop today:
  




May 29, 2020
Design shelving for critters in new shop, based on the size of a xerox paper box.  Cut parts to length.  Build shelf frames.  Add legs.  



May 30, 2020
Toy Run today:
  1. Pickup toys from Ralph, inventory and tag and deliver to Inventory at Rick's:  Ducks (20), Small Bugs (30), PT Cruisers (31), and Hippos (17)
  2. As of 5-30:  410 toys from 2019 + 445 =  855 toys
  3. Drop off 3 boxes of blank critters to Rick's for cutting
  4. Picked up 120 rotors from Rick for helos.
  5. Pick up two older TVs from Rick for Recycling.
  6. Ralph needs wheels and axles and glue.

May 31, 2020

Kathie sealed toys (98) today.  Now have toys available for hand-sanding.

Our June event for the Kenadi Jean Weis Foundation fundraiser is cancelled.
Darwin and Lauree dropped off two boxes of critters, brought scraps for Rick for making rotors, brought thin toys ready to router/spray.  They took home heart boxes to add felt inserts.  They also brought thick poplar for use in toymaking.

PS - Attention Band Saw Owners - Darwin has 3 new bandsaw blades to give away - they are 3/8" x 67 1/2" long.  Give him a call, if you can use them:  430-5728.

June 1, 2020
Talked to Danny Green today about the Wood-turning Special Interest Group.  He may have a few small informal sessions during the upcoming months.  Has been applying coats of polyurethane to the Fire Bell.

I sprayed toys (362) today including McQueen racers (30), Rabbits (16), Whales (20), Dachshunds (30), Turtle Pull Toys (22), Old Volkswagen (20), Thin Fire Truck 2 (37), Love Bugs (90), Small car 2 (27), Small car 3 (29), Tater Bugs (31) and Slim Rabbits (10).  As of today, there are approximately 460 toys in the final stages of sanding and spray finishing.

  






June 2, 2020
VOTE and take a load of items to Hot Springs for Recycling.  Grass is growing.


For more information about the Woodworkers, click here:   RCWA



Tuesday, April 28, 2020

Toy Program Update: 5-8-2020 -- No Monthly General Meeting in May

In lieu of the May 2020 General Meeting, here's an update and activity log of toy-making since last month's update:  We continue with our virtual Toy Workshops, that is, everybody working remotely in their own shops.

It's been a few weeks since our last update.  Boxes have mysteriously been moving in and out of members shops and into sanding homes, sealing booths, finishing booths, and wheel assembly areas.  Many members have had a little more free time on their hands recently, but some are still fully employed.  Here's a recap of the mysterious movement of boxes.

April 14, 2020:  (9 degrees and snowing – heavy Hallmark snow)

Bob – drilled 8 holes for crayons in about half of the crayon whales.  Rick texted that he had finished the airplanes, so I emailed Ralph to let him know the airplanes were ready for wheels. 

April 15, 2020:  (30 degrees and snowing)

Ralph picked up airplanes from Rick’s shop in Black Hawk.  He also picked up jigs and wheels.  Ralph’s inventory:  495 standard wheels, 495 axles (at least), 200 yellow axles, 170 blue axles.  Ralph will install two wheels on each airplane using the special airplane wheels jigs.

Jim brought 5 boxes of toys to Bob’s shop.  With some edge round-over routering, they will be ready to be sealed.  Jim picked up two more boxes of blanks from Bob and took them home to work in his shop.

Bob finished drilling holes for crayons in the rest of the crayon whales.

April 16, 2020: 

Loaded the buckboard and headed to town to take on supplies – last trip to Sam’s was 17 days ago.  
Delivered two boxes of chalkboard blanks, cut to size with scroll-sawn handles cut out to Gary Graves, plus items for ICU Items.  Received a box full of critter bags (12) sewn by Pat Graves.  Gary and Pat team up to make the fancy chalkboards, complete with chalk on a string.

Mailed masks to kids in Indiana and CA. Mailed package to Oregon City for Aunt Barb’s 100th Birthday.

April 17, 2020:

Lon dropped off two boxes of toys ready to be sealed.

Ed brought two boxes of toys hand-sanded by Gloria, ready for final finishing.  Ed also brought a box of caravans, cut, drilled, routered and sanded and ready to seal, and four more boxes of toys ready to be sealed.  Ed took home two boxes of toys for hand-sanding, and two boxes for edge routering.

April 18, 2020 – Woodworking Show scheduled for today at Knecht Home Center was postponed to a later time.

April 19, 2020:

Zoom with kids in CA; sketch out plans for movable base for Pattern File cabinet;  make short video to send to A Barb for her birthday party.

April 20, 2020:

Prepared the sealing room for Kathie.  Move boxes around to prepare for sealing.  Move stack of boxes for Routering to new shop.  Move stack of boxes for hand-sanding to stall #2.

April 21, 2020: 

Jerry and Patsy Hood brought two boxes of heart boxes, two boxes of fire trucks and toy wrecker hooks, all ready to be sealed.  Jerry also brought all the Show Ducks, completed and ready to give out at the Woodworking Show.

Kathie sealed 10 double heart boxes, 43 single heart boxes, 37 thin firetrucks, 35 thick firetrucks, 32 PT Cruisers, 20 Hippos, 32 little VWs, 22 caravans and trailers, and 26 wrecker hooks.

April 22, 2020:

Mary Jo brought two boxes of hand sanded toys, ready for final finish.  She took home four boxes of toys to hand sand including turtle banks, and paddles.

April 23, 2020:

Al Oines dropped off three boxes of toys ready to seal including whales, and ring toss sticks.  Al brought home two boxes of toys to edge router.

Bob and Kathie picked up completed airplanes (152) from Ralph and moved them to inventory at Rick’s shop.  Then we dropped off four boxes of wheels (2400 x 4 = 9600) to the RV Barn at Danny and Mary’s.  Bob picked up ¾” stock for basketball games from Danny’s. 

Boxes on hand for cutting, etc, include Sharks, Love Bugs, Wreckers, and Delivery Trucks.

April 24, 2020:

We picked up two boxes hand-sanded by Bel and dropped off 3 more boxes to hand-sand.

Jim B dropped off two boxes here, and picked up two more boxes to work on in his shop. 

April 25, 2020:

Lon picked up two more boxes to process at his shop.  Ken and Carol dropped by with three boxes of toys ready to seal.  Refrigerator is not cooling, move everything to compact frigs in shop and basement.

April 26, 2020: 

Research common refrigerator failure modes.  Rearrange all boxes in garage to prepare for sealing on Monday.

April 27, 2020:

Call refrigerator repair center; on calendar for Wednesday.  Ed returns to work.

Kathie sealed 258 toys:  91 love bugs, 30 ATVs, 20 sedans, 31 tater cars, 27 small oldies, 22 turtles, 17 rabbits, 20 whales.

April 28, 2020:  (Very windy today)

Al dropped off two boxes, after edge routering, all ready to seal, to the rough wood chair.  

Flash: some business/restaurants may soon be opening.

April 29, 2020: 

Zoom with kids in CA.  Prepare garage for spraying.  Refrigerator is repaired – YAY!

April 30, 2020:  (almost 80 degrees today!)

Spray boxes (and more boxes) of toys in PM:  258 toys plus ring toss sticks. 

Heart Boxes (43 single, 10 double) are ready for felt inserts.

Email sent out today:  MAY EVENTS are cancelled until further notice:

Greetings:  Just to let you know that at this time, all events for May for RCWA are cancelled until further notice.  Updates will be announced if they occur.  We will need to have access to the church for our meeting place and the Club for Boys for our workshops, so until access to those sites is available, we will remain at home.  Everyone keep up the good work.  Toys are continuing to be worked.  I have a stack to the ceiling needing sanding, and another smaller stack needing to be routered.  I even have one box yet to be cut.  Stay safe.  Bob and Rick

 ---------------------------------------------------------------------

Wow, this just seems like one continuous workshop!

-------------------------------------------------------------------

May 1, 2020:  Saw pair of B1's fly over on edge of Rapid City - saluting health workers - as we were coming back from Hot Springs auction pickup.

May 2, 2020:

Paul Douglas picked up three boxes of toys for hand-sanding.

Bob packed up toys that were dry after spraying, so that:  Several boxes of toys are ready for wheels, the heart boxes are ready for felt, and the ring toss sticks are ready for ring/string install.  Rick is planning to spray more wheels.

May 3, 2020:  Build double fan holder #2.

May 4, 2020:  (Cool and windy)

Jim brought two boxes of toys (Wreckers with jig to cut slots, and love bugs) ready to seal.  Jim sent a video of his mini-wood working show at his home.

May 5, 2020:  Escape day – resupply

Lon dropped off two boxes completed and ready to seal.

We dropped off 3 boxes at Mary Jo’s for hand-sanding, and picked up four boxes from her, ready to spray finish.

We dropped off 3 boxes at Bel’s parking lot for hand-sanding, and picked up three boxes from Bel, ready to spray finish. 

We visited McDonald’s, Sam’s and the gas station, Menard's, Hobby Lobby, Millstone, and Mary Jo’s and Bel’s.

May 6-7-8, 2020:  Blustery day

Finish double fan assembly, with 2.5” wheels on the double thick base.  Built movable base for two-drawer pattern file cabinet. Add cleats, and wheels.

Errands in town, mail package for birthday, get propane, get gas for mower.  Pick up rocks.  Grass is growing.

----------------------------------------------

Everyone keep up the good work.  Toys are continuing to be worked.  Stay safe.



For more information about the Woodworkers, click here:   RCWA




Thursday, April 16, 2020

Mini-Woodworking Show April 2020 - "Anything that Flies"

RCWA Members - regarding the previously planned April 18,2020 Woodworking Show

The Weisbeck household is quite sad to not be able to share in the regularly scheduled wood show with the crew. So, we made a mini-wood show and video to share with everyone!

We would love if you would share the below video link with the RCWA members and impart our best wishes that everyone is safe and healthy during this tough time. We miss you all!  

Cori, Rick, and Mary Weisbeck


Click on this Link for the Weisbeck Mini-Woodworking  Wood Show 2020:

Sunday, April 12, 2020

Toy Program Update - 4-13-2020 - No Monthly Meeting in April 2020

In lieu of the April General Meeting:  Last update was Mar 31, 2020.  Since then, we have been having virtual Toy Workshops, that is, everybody working remotely in their own shops.

We started “Phase 1 – Tracing” on Jan 11, 2020, our first workshop (TWS01) in 2020.  We did “tracing” at this workshop, and continued this effort in Toy Workshops 2 thru 4 (TWS02 thru 04).  At the end of Toy Workshop 4, we had traced 2,260 of our traceable toys which is 93%.  Our goal for 2020 is 2,800 toys.  During the first four workshops, some folks were able to move onto the other activities in phases 2 thru 5, but the majority of the efforts was “Tracing”.  Toy Workshops 01 thru 04:  we completed the tracing effort for 93% of traceable toys.

March 11, 2020 Pandemic Declared

There have been no schedule changes since the last update;  ie there are no activities planned for April 2020.  Updates will be issued as time goes on.

April 2, 2020 – ten inches of snowfall overnight.  Shovel Snow.


April 2, 2020:  Pack up sealed and sprayed toys for sanding and for wheels, respectively.
 




-------------------------------------------------------------------
April 3, 2020:  Bob cut basketball parts to 3" width for bases and backboards.
-------------------------------------------------------------------
April 4, 2020:  Bob cut basketball bases and backboards to length; 76 bases (3x10) and 28 backboards (3x4).

April 4, 2020:  Paul will be staying here for the foreseeable future, he has volunteered to do the peg spraying again.  Thanks Paul.

April 4, 2020:  Ken dropped off two boxes of toys ready to be sealed (Dachshunds and Puppy Dogs).  Ken picked up two boxes of toys to make from scratch.


-------------------------------------------------------------------

April 5, 2020:  Ralph went to Bob’s and picked up three boxes of toys that are ready for installing wheels.  Some of these toys use Finished Truck Wheels, which Ralph also picked up from Bob.  Earlier that day, Ralph picked up Finished Standard wheels and axle pegs (blue) from Rick.

April 5, 2020:  Shovel path to shed.
-------------------------------------------------------------------
April 6, 2020:  Lon dropped off two boxes of toys ready for sealing.  Lon picked up two boxes to work on at home from scratch.  Then he went fishing.

April 6, 2020:  Ken and Carol shopped at Menards for Lacquer Thinner and Zinsser’s Clear Shellac for Kathie for sealing.  They delivered them also.

April 6, 2020:  Bob power sanded one box of toys.  Kathie sealed 6 boxes of toys.  Toys sealed were:  Jeeps, Ducks, Puppy Dogs, Dachshunds, Helicopters, and Small McQueen Racers (total of 165).  Ten boxes are ready for sanding, and four boxes ready for wheels.




-------------------------------------------------------------------
April 7, 2020:  I ordered wheels and pegs for 2020 Toys from Smith Wood Products in Texas.  They have only a small number of employees and live in a large 50, 000 sq ft ware house, and are still working.  They had my order on their dock by 4 pm.

April 7, 2020:  We dropped off two boxes of Toys for hand sanding to Mary Jo, and dropped off two boxes of Toys for hand sanding to Bel.  Cleaned out 3 bird houses – spring is here.  Had a fine dining experience from Wendy’s with an outside picnic at Canyon Lake Park.
-------------------------------------------------------------------
April 8, 2020:  Ralph sent email, he has 3 boxes of toys ready for inventory.  Will pick up on next trip to town.
-------------------------------------------------------------------
April 9, 2020:  Jim dropped off three boxes of critters, only need Routering, and one box of toys that needs Routering.
-------------------------------------------------------------------
April 10, 2020:  Received wheels and pegs from Smith WOOD PRODUCTS in Fort Worth, TX, via Fed Ex before 10 am.  Total order:  six boxes of wheels (2400 x 6 = 14,400 wheels) and one box of pegs (15,000).


-------------------------------------------------------------------

April 11, 2020:  Met Ralph at his place, picked up toys ready for inventory (Pickups – 16, Oldies -31, Busses -30:  total 77).  We then delivered these toys to Ricks, where we bagged and tagged them and put them upstairs in the Inventory.  Delivered two full boxes of wheels to Rick (4800).  Also delivered three boxes of critters to Rick for Routering with the Dremel routers.  Rick is working on assembling and spraying airplanes.  (As of this morning at 8 am, Rick has 163 planes ready for wheels.)


April 11-12, 2020 – ten inches of snowfall overnight.  Shovel Snow.

April 12, 2020:  Toy Blanks remaining at Bob's:  two boxes.

April 13, 2020:  Darwin reported that he has finished cutting four boxes of critters,  and Lauree drilled holes for eyes in the critters and other toys.  Darwin has two more boxes of 2" toys to cut.

I know that lots of other work is being done in personal shops.  I will add updates, and photos  with captions to this blog as I receive them from you.

For more information about the Woodworkers, click here:   RCWA


Tuesday, March 31, 2020

Toy Program Status 3-31-2020


Toy Program Status 3-31-2020 – A look back less than 3 weeks ago

THE TOY PROGRAM.    The Toy Program effort consists of 5 major phases:
Phase 1:  Tracing
Phase 2:  Cutting toys to shape
Phase 3:  Milling - routering, drilling, and machine sanding
Phase 4:  Finish - sealer coat - sanding - final spray coat - final sanding
Phase 5:  Wheel installations

We started “Phase 1 – Tracing” on Jan 11, 2020, our first workshop (TWS01) in 2020.  We did “tracing” at this workshop, and continued this effort in Toy Workshops 2 thru 4 (TWS02 thru 04).  At the end of Toy Workshop 4, we had traced 2,260 of our traceable toys which is 93%.  Our goal for 2020 is 2,800 toys.  During the first four workshops, some folks were able to move onto the other activities in phases 2 thru 5, but the majority of the efforts was “Tracing”.
Toy Workshops 01 Jan 11, 2020
Toy Workshops 02 Jan 25, 2020
Toy Workshops 03 Feb 8, 2020
Toy Workshops 04 Feb 22, 2020
Toy Workshops 01 thru 04:  we completed the tracing effort for 93% of traceable toys.

March 11, 2020 Pandemic Declared

Toy Workshop 05 – March 21, 2020:  The exchange – no toymaking today, just distributed boxes of blank toys, toys ready for sealing, and cleared the storage room at the Club for Boys.



It snowed March 25, 2020

Toy Moveout – March 26, 2020 – moved all remaining boxes of blank toys, some tools, wheel jigs and presses, and the pattern file cabinet out of the Club for Boys into several member’s possession, as the Club for Boys is now closed to all outside groups.




March 28 – Rick brought turtle banks to Bobs for sealing; Bob gave Rick airplane wings to install on toy program airplane fuselages, Bob gave Rick the wheels remaining from 2019 (approx. 1800), plus almost 6000 pegs for painting.

March 24 – Darwin and Lauree pink slips – until further notice.

March 27 – Ed pink slip – until further notice.

March 30, 2020 – Bob picked up boxes of sanded toys from Mary Jo’s, from Ed and Gloria’s, and Bel’s.  Rick spraying wheels, and painting pegs.

March 31 – Ed brought a box of toys ready for sealing; and chalkboards with handles cut out;  he picked up 4 more boxes to cut and two more to sand (after seal).


March 31 – Kathie sealed 6 boxes of toys (bears, ameba cars, comic helicopters, Slimline rabbits, turtle banks, and paddles); Bob finish sprayed three boxes of toys (busses, oldies, and pickup trucks).  One box needs truck wheels; the rest need standard wheels.



 

March 31, 2020 - New Horizon Band concert schedule and practices are now cancelled until June, with no makeup concerts planned.

Wowsa – don’t fall asleep too long, things are happening fast.

It’s almost like we need to cross-train everyone to be able to do everyone’s jobs, like Costco or Sam’s Club.  We have lots of people who are respecting a “Stay at Home” order and have a lot more home time on their hands.  Because of this, we are progressing at an amazing rate. 

Wheel Assembly is the last operation for most toys.  If you are a Wheel Guy (only), just be patient and let the system work its way out.  Or get crosstraining.  But soon, and very soon, there will be no vacations permitted for the Wheel Guys!


For more information about the Woodworkers, click here:   RCWA