Toy Workshop: Sept 7th, 2019 from 9 to noon at CFB
Temperature at game time: 75 degrees F, sunny, windy
Attendees (25): Harley, Paul, Kathie, Lauree, Jim, Ken, Danny, Ethan, Grant, Rollie, Julian, Al, Rick, Darwin, Ed, Bob, Jerry, Gary G, Steve L, Lon, Mary Jo, Gloria, Ralph, Bel, Mary
Activities today:
Hand Sanding Tractors edges before sealing: Kathie, Mary Jo
Hand Sanding Toys after sealing: Kathie, Mary Jo, Gloria, and Al
Installing wheels/pegs on toys and Rotors on Helicopters:
Lon, Harley, Ralph, Bel, Mary, Lauree
Installing ears on Dachshunds: Julian
Lon, Harley, Ralph, Bel, Mary, Lauree
Installing ears on Dachshunds: Julian
Maintenance on glue bottles and Injectors: Harley
Sanding (1st and 2nd time) with Rigid sander/1" belt sander/Routering:
Jim, Ken, Paul, Ethan
Logistics: Grant, Matt, Jerry H, Bob, Danny
Routering critters: Rollie
Jim, Ken, Paul, Ethan
Logistics: Grant, Matt, Jerry H, Bob, Danny
Routering critters: Rollie
Scroll-sawing toys to shape: Ed, Rick, Darwin
Danny and Mary cut rough block stock into large and small blocks for Paul in June. Paul finished sanding and routering about 300 blocks in late August at his home shop. Kathie completed sewing of 30 + heavy duty cloth bags for the blocks. Members packed the block bags with ten large blocks and ten small blocks each. 29 bags were filled and tagged for inventory.
Danny and Mary cut rough block stock into large and small blocks for Paul in June. Paul finished sanding and routering about 300 blocks in late August at his home shop. Kathie completed sewing of 30 + heavy duty cloth bags for the blocks. Members packed the block bags with ten large blocks and ten small blocks each. 29 bags were filled and tagged for inventory.
Results today:
Toys completed, packed and sent to inventory: 219
Rick transported the completed toys to the Store Room.
Total Toys in inventory to date: 533+219=752
Photos from today's workshop: