Toy Workshop 11-9-2019 (TWS2019-22)
Expected temperatures: 64 by noon, gusty winds
Attendees (29): Bob, Danny, Mary, Paul, Gary, Rollie, Ken, Julian, Patsy, Jerry H, Jim, Tony, Rick, Ed, Ralph, Gloria, John, Frank, Darwin, Lauree, Jerry N, Keith, Bel, Harley, Mary Jo, Lon, Al, Harold, and Grant.
Results today:
Toys completed, packed and sent to inventory: 259
Total Toys in inventory to date: 2,800 +259 = 3,059
Planned Activities:
Installing wheels on caterpillars, helicopters, Love Bugs
Final sanding of ring toss games
Rings on ring toss games
Strings on cup and ball games
Drilling holes in Caravan trailers for spare tire
Hand-sanding several boxes of toys, including Caravans (cars + trailers), and three boxes of other toys
Some routering and rough sanding, depending on what is returned
Toys shown here are being sprayed with a final water-based polyurethane clear finish, ready for wheels or rotors to be installed.
Ring Toss sticks were turned at home by Al and Ed. Here, the Ring Toss sticks and Love Bugs are being sprayed with a final finish.
Heart boxes were made by Jerry H at home. Here they are being sprayed with a final coat of spray; they still need to have felt inserts added; Lauree will do homework.
Wheel Line working ovetime!
Final hand-sanding operation:
Cup and Ball - turned by Danny at home; strings and balls added here at the Toy Workshop.
Scrolling the last few toys - cut to shape - Darwin at TWS
Sanding and routering (outside) - Jim - Ken - Jerry N
Drilling holes for Caravan Trailer spare tire mounts - Tony
Wheel installation
Results today:
After rough sanding, and routering, there are six boxes of toys ready to be sealed: 143 Toys to be Sealed. This includes a box of toys back from Dr. G at ICU and miraculously are ready for final spray. (Note: Toys were sealed on 11-10-2019 and are now ready for hand-sanding before final finish is applied.)
Four boxes of critters were completed and turned in for packing into cloth bags.
Two boxes of Love Bugs (71+) have wheels installed and are ready to go.
Two boxes of Love Bugs (71+) have wheels installed and are ready to go.
After final hand sanding, two boxes of toys are ready to be spray finished for next weekend. (Note: final finish was applied on 11-9-2019 afternoon, and are now ready for wheel installs.)
Caravans were fitted with wheels (6) here at the TWS. The trailer hitches and the spare tires will be installed at home. Final spray finish will then be applied. Slightly out of order, but still works. (Note: Trailer hitches and spare tires and final spray was completed on 11-9-2019 afternoon.)
Results today:
Total Toys in inventory to date: 2,800 + 259 = 3,059
Total Toys requested for 2019 (as of 11-9-2019): 2,613
General Meeting is Monday evening at 7 pm at 910 Wood Ave.
For more information about the Woodworkers, click here: RCWA