Facility Prep Notes 8-9-2021

8-2-2021

As we discussed briefly at our last meeting, we are investigating available places to hold workshops.  We have decided to move our workshops to the basement of Our Redeemer Lutheran Church annex starting in September.  This will take place slowly over the next four weeks, so that we can hold our September workshops in the new location.

Rick and I did a site survey today.  Our first action is to prep a small room to hold our in-work and finished toys.  So our first need is drywall.  We will need 3 sheets of 1/2" drywall 4' x 8'.  Then we will need to build about four shelving units that will be 2' D x 6' H x 6' L.  We will need some sheets of 1/2" to 3/4" material for the shelving.  We have some 2x4s, but may need more.  We will probably need to build 3 or 4 simple workbenches.  We will probably need a couple of good fire extinguishers, box fans, a first aid kit, some tables, chairs, and workbenches.

We will be starting work soon; the plan is evolving, so if you can help, or have surplus materials, please let me or Rick know.  Thanks.  Bob B
















For more information, go to www.rapidcitywoodworkers.com.