Saturday, October 15, 2022

Prep for next TWS (week of Oct 16)

 Next week:

Wheels on toys

Handsand toys
Finish building airplanes
Finish tugboat building
Finish sanding and rounding over blocks
Bag up blocks
Bag up critters

Add new shelf (high) in store room
Add back to bookshelf
Paint the bookshelf

Revitalize a second lower work bench on wheels for routers
Build up another router in a table

Basketball game sub assembly building
Ball and string assembly (for two toys)
Ball and wooden ring assembly (ring toss game)

Pickup trucks assembly (with tankers, water trucks, etc.)


PADDLE GAME (Hardwood)

Working up a prototype of a thin hardwood paddle game:






Three holes:  1 1/4", 1 1/2", and 1 5/8" diameters

Holes are 2 1/8" apart - center to center.









Seal toys:

Kathie sealed 142 toys on Monday.




Spray toys:


Bob sprayed toys on Wednesday - six boxes of wheeled toys plus 47 tugboats.









Assembly of Turtle Banks 






Rick finished and boxed up 52 turtle banks on Thursday (10.20.2022) and delivered them to Jerry who will bring them to the Wood Shop for entering them into inventory.

Rick also finished a box of 160 blocks (8 block bags) both sanded and routered and gave them to Jerry to bring to the Wood Shop.  A special session of a small group on Friday is planned to finish up sorting and bagging of critters and blocks.  We are planning for 40 block bags and 100 critter bags.

Received our Shipment of Dolls for Cradles

Box 1



Box 2


Getting ready to Spray more Toys




  For more information, go to www.rapidcitywoodworkers.com.