Monday, October 21, 2024

Prep for Next TWS (10-26-2024)

 To Do's This Week

1.  Seal some toys (65)

2.  Spray some toys (237)

3.  Make some Basketball Game posts (cut/round over one end/cut slot in other)

4.  Spray hoop sub-assemblies (100)

5.  Attach posts to bases - secure with tiny wedges (100)

6.  Sand posts flush with bottom of base (100).

Photos


Seal toys (10-19-2024) - two boxes (65 toys)

Make some Basketball Game posts /(10-21-2024)



Spray toys (10-21-2024): 237 toys





Spray hoop sub assemblies (100) (10-21-2024)



Load sealed and sprayed toys (10-21-2024)



Fun times for Kathie (10-20-2024)



Attach posts to bases (100) - 10-23-2024





Posts are secured to bases with small wedges.


The posts will be sanded flush with the bases when the glue is dry.


Posts have been sanded flush (10-24-2024).  Boxes were loaded into the truck.  
Hoop subassemblies will be attached to bases this weekend.




Turtle Banks - Rick is drilling holes in the plexiglass covers for the Turtle banks.
The covers are made from sheets of Plexiglas using the CNC router.

. 



Here's the jig used to securely hold the covers for drilling.







Exotic wood - Zebra Wood - used for a back board


Chalk boards


Pat Graves is adding the chalk paint to the basic birch chalk boards.