Monday, October 21, 2024

Prep for Next TWS (10-26-2024)

 To Do's This Week

1.  Seal some toys (65)

2.  Spray some toys (237)

3.  Make some Basketball Game posts (cut/round over one end/cut slot in other)

4.  Spray hoop sub-assemblies (100)

5.  Attach posts to bases - secure with tiny wedges (100)

6.  Sand posts flush with bottom of base (100).

Photos


Seal toys (10-19-2024) - two boxes (65 toys)

Make some Basketball Game posts /(10-21-2024)



Spray toys (10-21-2024): 237 toys





Spray hoop sub assemblies (100) (10-21-2024)



Load sealed and sprayed toys (10-21-2024)



Fun times for Kathie (10-20-2024)



Attach posts to bases (100) - 10-23-2024





Posts are secured to bases with small wedges.


The posts will be sanded flush with the bases when the glue is dry.


Posts have been sanded flush (10-24-2024).  Boxes were loaded into the truck.  
Hoop subassemblies will be attached to bases this weekend.




Turtle Banks - Rick is drilling holes in the plexiglass covers for the Turtle banks.
The covers are made from sheets of Plexiglas using the CNC router.




Here's the jig used to securely hold the covers for drilling.







Exotic wood - Zebra Wood - used for a back board


Chalk boards


Pat Graves is adding the chalk paint to the basic birch chalk boards.