Saturday, November 9, 2024

Prep for Next TWS (11-16-2024)

 To Do's This Week

1.  Seal some toys (7 boxes) + (2 boxes -  Rick)

2.  Spray some toys (6 boxes)

3.  Three boxes in WIP room - need to be sanded and routered before seal - sand - spray.

4.  Put strings on Paddle Games when complete.  Jim Brown made more ball and strings.

5.  Heart Boxes - Lauree will be putting felt in bottom of each heart box this week.  She will also add the necklaces to each heart box.

6.  Rectangular jewelry boxes.  Nick is working this.

7.  Paddle games.  Bob and Jerry are working on this.  Holes are drilled (3 per paddle),  4x4s are resawn.  On 11-10-2024, Jerry cut handles to shape and sanded,  then routered the edges.  Bob sealed the paddles on 11-12-2023.  String/balls will be added at the next workshop.

8.  TOY COUNT:  3335 traced, 3051 in inventory - less than 300 more to finish.


_-----------------------_

Results:

1.  Seal some toys (11-11-2024):  Three kinds of 1" cars +  Firetrucks.+ Hippos (1") = 128

. 106

.  22

128 today





2.  Build paddle games (11-11-2024) - Jerry finished cutting 55 Paddle Games to shape, sanded and routered.  Passed to Bob at General Meeting.  Next step is sealing.




3.  Seal more toys (11-12-2024):  

Paddles (57) + 30s cars + Fire trucks + Love Bugs (2 sizes) + Hippos (2") +Delivery Vans =  187




Total toys sealed this week:  128 + 187 = 315 ready to handsand.


4.  Spray finish toys (11-13-2024):  226 ready for wheels



118 + 108 = 226 now ready for wheels












11-15-2024:  Load into truck - bring to TWS.





Ready for TWS on Saturday Nov 16, 2024.